Welcome to the official website of Shandong Guanxian Minsheng Road and Bridge Municipal Engineering Co., Ltd.!
Waveform Fence Board Forwarding | Yunnan: State Grid G8012 Maitreya-Chuxiong Expressway will start construction next year
Release Time:
2023-08-14
Recently, the website of the Yunnan Environmental Protection Agency has linked up the second public notice of the project's environmental impact assessment from the "Mile to Yuxi section of the Miele-Chaoxiong Expressway G8012" and the "Yuxi to Chuxiong" sections, and solicited opinions and suggestions from the public. The recommended length of the Maitreya to Yuxi section is 121.645km, the recommended length of the Yuxi-Chuxiong section is 188.718km, and the design speed is 100km/h. From now on, the journey from Maitreya to Yuxi will be shortened to 1.2 hours, while the Yuxi-Chuxiono journey will be shortened to 1.8 hours. At the same time, it will help alleviate the traffic pressure from Kunming to Chuxiong Expressway.
Recently, the website of the Yunnan Environmental Protection Agency has linked up the second public notice of the project's environmental impact assessment from the "Mile to Yuxi section of the Miele-Chaoxiong Expressway G8012" and the "Yuxi to Chuxiong" sections, and solicited opinions and suggestions from the public. The recommended length of the Maitreya to Yuxi section is 121.645km, the recommended length of the Yuxi-Chuxiong section is 188.718km, and the design speed is 100km/h. From now on, the journey from Maitreya to Yuxi will be shortened to 1.2 hours, while the Yuxi-Chuxiono journey will be shortened to 1.8 hours. At the same time, it will help alleviate the traffic pressure from Kunming to Chuxiong Expressway.
The reporter learned that the "National High-Geonet G8012 Maitreya-Chuxiong Expressway" project has a total length of 310 kilometers and is planned to be built on a two-way 4 (6) lane standard with a design speed of 100 kilometers per hour. At present, it is divided into Maitreya to Yuxi, Yuxi to Chuxiong and the 2nd section is under construction. Among them, the length from Maitreya to Yuxi is 121.645 kilometers. The technical standard is two-way six-lane expressway. The Yuxi-Chuxiong section has a total length of 188.718 kilometers. The technical standards for the Yuxi-Yimen section are to be built according to the standard of two-way six-lane expressway.
According to the EIA report, the project from Maitreya to Yuxi starts in the southeast of the new post in Maitreya and forms a “T” crossover with the Guang-Quan Expressway (Shilin to Suolong Temple Section). The end point ends at Duoyishu in the territory of Hongta District of Yuxi City. From Kunming to Mogao Expressway G8511. The entire line runs from east to west. The total length of the recommended line is 121.645km, including 41.530km in Honghe, and 80.115km in Yuxi.
The Yuxi-Chuxiong section of the project starts in Hongta District of Yuxi City, Yunnan Province, and connects Kunming to Mogao Expressway G8511. The end point ends at Daba Village, Chuxiong City, Chuxiong Prefecture. The entire line runs from southeast to northwest, with a total length of 188.718km.
According to the project feasibility study report, the Maitreya-Chuxiong Expressway will officially start construction in 2017 and is expected to be completed by 2020.
Latest News